DUST-A-SIDE DELIVERING SUSTAINABLE ENERGY

 SAVINGS TO MINES IN SOUTH AFRICA

The Government Section 12L Energy Savings Tax Incentive has been made accessible to Dust-A-Side customers. Energy saving projects identified and submitted to SANEDI for the Section 12L Tax Incentive are as a result of Dust-A-Side’s DASMetrics haul road performance monitoring and reporting solution.

Dust-A-Side began engaging with its clients regarding the Section 12L Energy Savings Tax Incentive from the beginning of 2016.

The Section12L Tax Incentive on Energy Efficiency Savings Legislation (12L) was introduced on 1 November 2013 by government, aimed at promoting the efficient use of energy to safeguard the country’s security of supply and address environmental concerns.

On an annual basis 12L offers a tax incentive for large energy users who implement appropriate energy efficiency measures where energy performance improvement can be verified and validated by an Measurement and Verification Inspection Body. The tax deduction rate is currently 95 cents per verified kilowatt hour (kWh) of energy

saved – for the relevant year of assessment commencing on or after 1 March 2015. This opportunity to claim tax deductions applies until 1 January 2020.

Dust-A-Side has gained approval from Anglo American to implement the 12L tax incentive at 3 of its mines. ECS (registered and accredited Measurement and Verification Inspection Body) has been appointed by Anglo American to conduct the required verification and validation inspection work for the haul road energy improvement projects as conducted by DAS. The first phase of these projects is for 2016 and are currently being registered by ECS with SANEDI.

The South African National Energy Development Institute (SANEDI) is the organisation tasked with the responsibility of adjudicating, evaluating and supporting the Section 12L Energy Savings Tax Incentive.

Energy and Combustion Services (ECS) is an Energy and Productivity Improvement company delivering energy and emissions management solutions to large industrial and mining customers. ECS is a certified measurement and verification inspection body for energy savings accredited by SANAS and SANEDI.

DASMetrics Dust-A-Side’s Haul Road Condition Monitoring, Reporting and Workflow Management solution developed by Dust-A-Side. Through DASMetrics, Dust-A-Side is able to quantify the reduced diesel/fuel usage of all trucks and equipment on DAS roads.

DASMetrics:
· Auditing – offers a scientific auditing process ensuring
continuous improvement of Haul Road quality
· Workflow Management – allows the user to schedule,
assign and track tasks such as audits and repairs
· Monitoring & Reporting – provides unique processes
and systems to monitor and report on Haul Road
condition and performance

Key benefits:
· Fuel savings CO2 avoidance
· Productivity increase Tyre wear savings
· Water savings Dustiness reduction
· Improved safety

MGM Project Services is Dust-A-Side’s strategic partner responsible for operational consulting on project services for the 12L projects. They are responsible for increasing Dust-A-Side’s footprint, proving DASMetrics’ capabilities and leveraging 12L benefits for each mine site.

Step 1: Identifying savings per mine site through DASMetrics’ measurement and verification reports.

Step 2: Opportunity scope – Operational current state and potential projects are reviewed and identified for implementation
Step 3: These projects are reviewed by ECS who
establishes the potential 12L rebate target for each site.
Step 4: On instruction from the mine ECS registers,
implements and runs the project for the relevant tax
year.

There are five areas which are being reported on:

1. The fuel being avoided due to less rolling defect score (RDS) on a Dust-A-Side treated haul road versus an untreated haul road.

2. The emission reduction on Dust-A-Side treated haul roads due to the improvement of the haul road condition vs untreated roads.

3. The increase in production on Dust-A-Side treated haul roads due to the improvement in haul road condition
4. The reduction in tyre wear as a result of the improved haul road conditions.

5. The reduction in water use when applying the Dust-A-Side product

Step 5: ECS tracks and reviews the project
performance progress and verifies and validates the
project performance at the end of the period. This is
then submitted to SANEDI for review and granting of
the Tax Incentive Certificate.
Step 6: Opportunity scope is conducted for the coming
year which includes road extensions and additional
savings measures in order to improve on 12L benefits
for next period.

DASMetrics Value Report example, the information
below has been taken from a current DASMetrics site.
It is important to note that this extract is from a current
value report that has been validated by ECS who is an
accredited M&V Inspection Body.

 

Dust-A-Side’s effciency proposal has been introduced to
Anglo American where 7 DASMetrics systems are currently in use. The 2017 proposal for Anglo American has been
approved and these sites will run the full project in 2018
with proposed savings in mind.

Dust-A-Side is the only company in the world to offer this
benefit to its clients, with ECS being the only verification
company concerned with diesel usage in South Africa.
Verification and quantification cannot be done without
Dust-A-Side’s DASMetrics solution.

As can be seen Dust-A-Side is committed to differentiate itself from other service and product suppliers by delivering consistent and sustainable value to its customers. The inherent performance and value of Dust-A-Side haul road quality as well as the capitalisation of Government Tax Incentives are clear evidence of this.
How DASMetrics works

Monitoring is performed via visual audits. A
specialised DASMetrics handheld device is used by a
trained operator to capture road defects, these are
synchronised to a database. The data is then
integrated, transformed and analysed to produce
reports via a DASMetrics dashboard which is used by
site managers as a haul road performance
management tool